Location:
San Rafael, CA
Owner:
City of San Rafael
Project Size:
9,924 square feet
In 2014, the City developed a comprehensive and operationally forward‐thinking Essential Facilitates Strategic Plan for the City of San Rafael. The plan would guide the City through the replacement and/or seismic upgrade of the City’s essential facilities to ensure their ability to serve the community in the event of a major earthquake or other potential disasters. It was determined that Fire Station 52, located at 52 Union Street, and Fire Station 57, located at 3530 Civic Center Drive were past their useful life and should be replaced at their existing locations. To achieve increased capacity, both stations will be enlarged to allow the placement of paramedic ambulances.
On June 7, 2017, the City issued Notice to Proceed to Alten Construction, Inc. and Alten achieved final completion of the entire work on December 9, 2019.